Deployment & Integration
How the capacity you rent got built: rack mount, cabling, OS and driver provisioning, network configuration — four phases, one point of contact. Also delivered as a standalone project.
What the engagement covers
-
Rack installation to vendor specification
-
Structured high-density cabling
-
Hardware setup and configuration
-
OS, driver and firmware provisioning
-
InfiniBand / RoCEv2 network configuration
-
Integration and load testing before handover
Four phases, planning to production
-
01
Plan & Prepare
Requirements gathering, data centre readiness assessment and infrastructure preparation.
-
02
Install & Deploy
Rack mounting, cabling, operating system installation, driver and firmware updates.
-
03
Configure & Test
Software configuration, network setup, integration testing and load testing.
-
04
Long-Term Support
Ongoing L1 data centre operations, RMA management and 24×7 SLA-driven incident response.
The rest of the lifecycle
Infrastructure Strategy
The sizing work behind every cluster we run — workload profile, power envelope, fabric choice. Available on its own if you are building an estate of your own.
03. ConnectStructured Cabling
High-density fibre is where a GPU cluster quietly loses throughput. Our own engineers do it — tested, labelled and documented — on the estates we run and on yours.
Tell us what you need to run.
Share your workload requirements, market focus, and timeline. Our expert teams across Taiwan, Singapore, Malaysia, and Indonesia will design the optimal compute service—leveraging our existing GPU capacity or building a dedicated infrastructure tailored to your needs.
Talk to our team →